|
 |
This project included environmental studies and
documentation, reconstruction or alterations of intersection signal and
appurtenances, pavement widening and reconstruction for turning lanes,
pavement markings and striping, driveway improvements/adjustments,
construction of an enclosed drainage system and the addition of a
pavement base drainage system, signing, geotechnical evaluation of
roadway subsurface conditions, and construction administration and
inspection. |